Count Locations (0)
Existing Intersections (1)
Intersection Projects (2)
| Interchange |
| 2050 Roundabout |
| 2050 Signal |
| 10-Year Signal |
| Intersection Improvement |
Future Intersections (3)
| Interchange |
| Signal |
| Roundabout |
| Stop |
Roadway Projects (4)
| 10-Year Widening |
| 10-Year New Road |
| 2050 Widening |
| 2050 New Road |
| Roads |
Future Functional Class (5)
| Highway |
| Major Arterial |
| Parkway |
| Minor Arterial |
| Major Collector |
| Minor Collector |
| Local Road |
| Future Freeway |
| Future Major Arterial |
| Future Minor Arterial |
| Future Major Collector |
| Future Minor Collector |
Existing Functional Class (6)
| Local Road |
| Highway |
| Major Collector |
| Minor Arterial |
| Minor Collector |
| Parkway |
Existing LOS (7)
| Acceptable (A, B, C) |
| Acceptable (D) |
| Unacceptable (E or Worse) |
| Local Road |
2030 No Build LOS (8)
| Acceptable (LOS C or Better) |
| Acceptable (LOS D) |
| Unacceptable (LOS E or Worse) |
| Local Roadways |
2050 No Build LOS (9)
| Acceptable (A, B, C) |
| Acceptable (D) |
| Unacceptable (E or Worse) |
| Local Road |
UTA Routes (10)
| UTA Routes |
| Future Route |
Roads (11)
City Boundary (12)
Mask (13)
Wildlife Corridor (14)
|