Utilities (1)
| Culinary Water |
| HP Gas Line |
| Sanitary Sewer |
| Secondary Water |
| Tank Line |
| <all other values> |
Phase_1a (2)
| 200 West |
| Existing Substation |
| New Substation |
| North Loop Road |
| Phase 1 Area Main |
| Porter Rockwell Blvd |
| R2R Partial East |
| R2R Partial West |
| South Loop Road |
| Temporary Detention Basin |
| <all other values> |
Water_Tank (3)
|