Existing Intersections (0)
| Signal |
| Stop |
| Roundabout |
| Railroad Crossing |
Existing Functional Class (2)
| Urban Other Principal Arterial (7 Lanes) (UDOT) |
| Urban Minor Arterial (5 Lanes) (UDOT) |
| Urban Collector (5 Lanes) (UDOT) |
| Major Arterial (7 Lanes) |
| Major Arterial (5 Lanes) |
| Minor Arterial (3 Lanes) |
| Industrial Arterial (3 Lanes) |
| Collector (3 Lanes) |
| Collector (2 Lanes) |
Existing LOS (13)
| Acceptable (LOS C or Better) |
| Acceptable (LOS D) |
| Unacceptable (LOS E or Worse) |
2030 No Build LOS (14)
| Acceptable (LOS C or Better) |
| Acceptable (LOS D) |
| Unacceptable (LOS E or Worse) |
2050 No Build LOS (15)
| Acceptable (LOS C or Better) |
| Acceptable (LOS D) |
| Unacceptable (LOS E or Worse) |
Intersections Projects (16)
| Phase 1 (0-5 Years) |
| Phase 2 (5-10 Years) |
| Phase 2 (5-10 Years) |
| Phase 2 (5-10 Years) |
| Phase 3 (10-20 Years) |
| Phase 3 (10-20 Years) |
| Phase 3 (10-20 Years) |
Streets Projects (17)
| Phase 1 (0-5 Years) |
| Phase 2 (5-10 Years) |
| Phase 3 (10-20 Years) |
2050 Intersections (18)
| Existing Signal |
| Future Signal |
| Intersection Improvement |
| Railroad |
| Roundabout |
2050 Future Functional Class (19)
| Urban Other Principal Arterial (7 Lanes) (UDOT) |
| Urban Minor Arterial (5 Lanes) (UDOT) |
| Urban Collector (5 Lanes) (UDOT) |
| Major Arterial (7 Lanes) |
| Major Arterial (5 Lanes) |
| Minor Arterial (3 Lanes) |
| Industrial Arterial (3 Lanes) |
| Collector (3 Lanes) |
| Collector (2 Lanes) |
| Local Road |
Railroads (9)
Municipalities (10)
| City Boundary |
Mask (11)
|