ArcGIS REST Services Directory Login
JSON

Legend (Orem_TMP_Published)

UTA Bus Routes (0)
UTA Bus Routes UTA Bus Routes
MAG Long Range Transit Plan (1)
Phase 1: 2019-2030 Phase 1: 2019-2030
Phase 2: 2031-2040 Phase 2: 2031-2040
Phase 3: 2041-2050 Phase 3: 2041-2050
Desired Light Rail Alignment Desired Light Rail Alignment
New Alignment New Alignment
Intersection Improvements (2)
New Interchange New Interchange
Grade Separated Intersection Grade Separated Intersection
New/Upgraded Traffic Signal* New/Upgraded Traffic Signal*
New/Upgraded Roundabout New/Upgraded Roundabout
New Traffic Circle New Traffic Circle
Intersection Improvements Intersection Improvements
New HAWK (PED) Signal New HAWK (PED) Signal
Existing Signals (3)
Existing Traffic Signal Existing Traffic Signal
Existing Roundabout Existing Roundabout
Existing HAWK (PED) Signal Existing HAWK (PED) Signal
Rectanglar Rapid Flash Beacon Rectanglar Rapid Flash Beacon
2050 Build Traffic Signals (4)
Freeway Interchange Freeway Interchange
Grade Separated Intersection Grade Separated Intersection
Traffic Signal Traffic Signal
Roundabout Roundabout
Traffic Circle Traffic Circle
Intersection Improvement Intersection Improvement
HAWK (PED) Signal HAWK (PED) Signal
2050 Build Future Functional Class (5)
Principal Arterial - UDOT (2-7 Lanes) Principal Arterial - UDOT (2-7 Lanes)
Principal Arterial- Orem (6-7 Lanes) Principal Arterial- Orem (6-7 Lanes)
Major Arterial - Orem (4-5 Lanes) Major Arterial - Orem (4-5 Lanes)
Minor Arterial - Orem (2-3 Lanes) Minor Arterial - Orem (2-3 Lanes)
Urban Collector- Orem (2-3 Lanes) Urban Collector- Orem (2-3 Lanes)
2050 Intersection Improvements (6)
UDOT UDOT
MAG/CITY MAG/CITY
2050 MAG RTP Projects (7)
UDOT UDOT
MAG/CITY MAG/CITY
CITY CITY
10 year Intersection Improvements (8)
UDOT UDOT
MAG/CITY MAG/CITY
10 year MAG RTP Projects (9)
UDOT UDOT
MAG/CITY MAG/CITY
CITY CITY
Existing ADT and Number of Lanes (10)
Acceptable (LOS C or Better) Acceptable (LOS C or Better)
Acceptable (LOS D) Acceptable (LOS D)
Unacceptable (LOS E or Worse) Unacceptable (LOS E or Worse)
Existing ADT and Number of Lanes (11)
Acceptable (LOS C or Better) Acceptable (LOS C or Better)
Acceptable (LOS D) Acceptable (LOS D)
Unacceptable (LOS E or Worse) Unacceptable (LOS E or Worse)
Existing Signal Level of Service (12)
Acceptable (LOS C or Better) Acceptable (LOS C or Better)
Acceptable (LOS D) Acceptable (LOS D)
Unacceptable (LOS E or Worse) Unacceptable (LOS E or Worse)
Roundabout (LOS C or Better) Roundabout (LOS C or Better)
Roundabout (LOS D) Roundabout (LOS D)
Existing Level of Service (13)
Acceptable LOS C or Better) Acceptable LOS C or Better)
Acceptable (LOS D) Acceptable (LOS D)
Unacceptable (LOS E or Worse) Unacceptable (LOS E or Worse)
Existing Signals (14)
Existing Traffic Signal Existing Traffic Signal
Existing Roundabout Existing Roundabout
Existing HAWK (PED) Signal Existing HAWK (PED) Signal
Roadway Network (15)
Principal Arterial - UDOT Principal Arterial - UDOT
Principal Arterial- Orem Principal Arterial- Orem
Minor Arterial - Orem Minor Arterial - Orem
Urban Collector- Orem Urban Collector- Orem
Orem City Boundary (16)
Mask (17)